Ogunde, Ayodeji and Ayodele, Rachael and Joshua, Opeyemi and Nduka, David and OGUNDE, Abisola and Ogundipe , Kunle Elizah and Ogunbayo , Babatunde F and Ajao, Adekunle M (2018) Data on factors influencing the cost,time performance of the Industrialized Building System. Data in Brief, 18. pp. 1394-1399. ISSN 2352-3409
PDF
Download (195Kb) |
Abstract
The data article provides the factors that influence the cost;time performance of the Industrialized Building System(IBS),its prospects and challenges. A survey technique was used for this research. Structured Questionnaires were administered to occupants of pre fabricated buildings and interviews were conducted with the professionals in the building industry. Statistical Package for Social Sciences(SPSSversion20)was used to analyse the data obtained from the questionnaires.The variables were ranked based on Relative Importance Index(RII)calculation.The Data indicated that IBS would be more economical if used for mass production.
Item Type: | Article |
---|---|
Subjects: | T Technology > T Technology (General) T Technology > TH Building construction |
Divisions: | Faculty of Engineering, Science and Mathematics > School of Engineering Sciences |
Depositing User: | Mrs Hannah Akinwumi |
Date Deposited: | 28 Feb 2019 09:32 |
Last Modified: | 28 Feb 2019 09:32 |
URI: | http://eprints.covenantuniversity.edu.ng/id/eprint/12442 |
Actions (login required)
View Item |