University Links: Home Page | Site Map
Covenant University Repository

Items where Author is "Mosaku, T. O."

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Item Type | No Grouping
Number of items: 6.

Amusan, L. M. and Mosaku, T. O. and Ayo, C. K. and Adeboye, A. B. (2013) Expert System-Based Predictive Cost Model for Building Works: Neural Network Approach. International Journal of Basic & Applied Sciences IJBAS-IJENS, 13 (01). ISSN 1215804-05-7272

Iroham, C.O. and Durodola, O. D. and Akinjare, O. A. and Mosaku, T. O. (2013) Depreciation in Plant and Machinery Valuation in Nigeria:A Pedagogic Framework. JOURNAL OF THE NIGERIAN INSTITUTION OF ESTATE SURVEYORS AND VALUERS, 38 (1). pp. 7-15.

Tunji-Olayeni, P .E and Mosaku, T. O. and Amusan, L. M. and Omuh, I. O. (2013) A comparative study of the Entrepreneurial Characteristics of Architecture and Building Students: Evidences from a Developing Economy. In: Creating Global Competitive Economies, November 13-14 2013, Rome, Italy.

Eneojo, Abah S. and Egwari, L. O. and Mosaku, T. O. (2011) In vitro Antimicrobial Screening on Anchomanes difformis (Blume) Engl. Leaves and Rhizomes Against Selected Pathogens of Public Health Importance. Advances in Biological Research, 5 (4). pp. 221-225. ISSN 1992-0067

Amusan, L. M. and Mosaku, T. O. and Ayo, C. K. and Adeboye, A. B. Expert System-Based Predictive Cost Model For Building Works: Neural Network Approach. Project Report. Unpublished. (Unpublished)

Amusan, L. M. and Mosaku, T. O. and Joshua, Opeyemi and Ayo, C. K. and Omuh, I. O. and Adeboye, J NEURAL NETWORK-ECONOMETRIC ENTROPY-BASED MODEL FOR PROJECT COST ADJUDICATION SYSTEM IN RESIDENTIAL BUILDING PROJECT PROCUREMENT. Unpublished. (Unpublished)

This list was generated on Mon Nov 24 04:39:32 2014 WAT.