University Links: Home Page | Site Map
Covenant University Repository

Items where Author is "Amusan, L. M."

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Item Type | No Grouping
Jump to: Article | Monograph | Thesis
Number of items: 12.

Article

Amusan, L. M. (2011) SUSTAINABILITY STRATEGIES IN ENGINEERING INFRASTRUCTURE MAINTENANCE IN DEVELOPING COUNTRIES: SELECTED SOUTH WESTERN NIGERIA STATES CASE STUDY. International Journal in Marketing IT and Management, 3 (4). pending-pending. ISSN 2231-4334 (In Press)

Amusan, L. M. AN APPROACH TO APPLICATION OF TOTAL QUALITY MANAGEMENT IN BUILDING MAINTENANCE OPERATION. Unpublished. (Unpublished)

Amusan, L. M. and Farinloye, O. O. COMPARATIVE STUDY OF INCENTIVES PROVISION IN INDIGENOUS AND INDIGENISED FIRMS. Unpublished. (Unpublished)

Amusan, L. M. and Anosike, N. M, and Joshua, Opeyemi and Adelakun, A. and Owolabi, D. J. Cost Entropy and Expert System Approach to Modeling Cost Smoothing System in Reinforced Concrete Office Building Projects Procurement. Unpublished. (Unpublished)

Amusan, L. M. IMPORTANCE OF INCENTIVES IN ENHANCING WORKERS PERFORMANCE IN CONSTRUCTION INDUSTRY. Covenant Journal of Science and Technology. (Submitted)

Amusan, L. M. and Oloyede, S and Tunji-Olayeni, P .E INNOVATIONS AND SUSTAINABILITY ISSUES INVOLVED IN GREEN PROJECT MANAGEMENT. International Journal in IT and Management, 2 (3). pp. 1-17. ISSN 2231-4334 (In Press)

Amusan, L. M. and Mosaku, T. O. and Joshua, Opeyemi and Ayo, C. K. and Omuh, I. O. and Adeboye, J NEURAL NETWORK-ECONOMETRIC ENTROPY-BASED MODEL FOR PROJECT COST ADJUDICATION SYSTEM IN RESIDENTIAL BUILDING PROJECT PROCUREMENT. Unpublished. (Unpublished)

Amusan, L. M. STUDY OF FACTORS AFFECTING CONSTRUCTION COST PERFORMANCE IN NIGERIAN CONSTRUCTION SITES. Unpublished. (Unpublished)

Amusan, L. M. SUSTAINABILITY STRATEGIES IN ENGINEERING INFRASTRUCTURE MAINTENANCE IN DEVELOPING COUNTRIES. Unpublished. (Unpublished)

Monograph

Amusan, L. M. and Mosaku, T. O. and Ayo, C. K. and Adeboye, A. B. Expert System-Based Predictive Cost Model For Building Works: Neural Network Approach. Project Report. Unpublished. (Unpublished)

Amusan, L. M. and Bamisile, A. O. PARADIGM FOR TOTAL QUALITY MANAGEMENT IN BUILDING MAINTENANCE OPERATION. Working Paper. Unpublished. (Unpublished)

Thesis

Amusan, L. M. (2011) NEURAL NETWORK-BASED COST PREDICTIVE MODEL FOR BUILDING WORKS. PhD thesis, Covenant University.

This list was generated on Sat May 25 00:17:17 2013 PDT.